Questions to ask before buying off-plan in Batumi

Off-plan flats in Batumi are cheaper, but you pay for a building that does not exist yet. Here are the questions I would ask the developer and myself before paying, and for every question a real case from local news in 2026.

ავტორთა აზრი შეიძლება არ ემთხვეოდეს რედაქციის პოზიციას

TP 4 წთ საკითხავი

სტატია ამ ენაზე არ არის. ნაჩვენებია: English

☰ სარჩევი · 8
  1. 1. When will the building be finished, and what if it is late?
  2. 2. Is the construction following its permit?
  3. 3. Will the flat be registered in my name, or do I only get the keys?
  4. 4. What does the registry extract show?
  5. 5. Is that a crack or an expansion joint?
  6. 6. What frame will I get?
  7. 7. How much is the registration?
  8. Sources

Many foreigners buy new build flats in Batumi, often before the building is finished. Local news this year shows what can go wrong. I am not a lawyer. This is a list of questions, not legal advice, and every case below has a link.

1. When will the building be finished, and what if it is late?

Batumelebi wrote on 17 August about a building on Grigol Eliava Street 53. The flats were supposed to be handed over in 2022. In 2026 it is still not finished: works stopped, the lift does not work, the stairwells are not finished. Buyers say the company office is closed and the explanations for the delay kept changing.

Important detail: the buyers say they are registered as owners in the registry since 2022. So a record in the registry does not mean the building will be finished. Ask the developer what the contract says about delays, and what you can do if the date passes.

2. Is the construction following its permit?

On 1 September the Batumi Municipal Inspection ordered to stop construction at Bagrationi Street 131 because works were done in breach of the permit conditions. During the foundation works the courtyard of the neighbouring building collapsed (Batumelebi, 04.09). The company said it was doing only the reinforcement works the inspection asked for.

Question to ask: what is the permit for this building, and were there any orders from the inspection? If the city stops the works, your flat waits too.

3. Will the flat be registered in my name, or do I only get the keys?

On 2 October police in Adjara detained two heads of a construction company in Batumi. According to Batumelebi, they took money for flats, did not register the flats in the buyers' names and gave only physical possession. After buyers paid for renovation, the same flats were sold again to other people. The charge is large scale fraud (Article 180), the damage is $190,502 and 42,600 GEL.

For me this is the most important question. Keys are not ownership. Ask when and how the flat (or your share) will be registered, and do not accept "later".

4. What does the registry extract show?

The extract from the National Agency of Public Registry (NAPR) is cheap and fast. It shows:

  1. cadastral code, purpose, area and address;
  2. owners and the documents of ownership;
  3. arrest or prohibition;
  4. tax lien;
  5. registry of debtors;
  6. mortgage, if the property is pledged to a bank.

The extract has a barcode and its authenticity can be checked on napr.gov.ge. Price: 20 GEL for 1 working day, 75 GEL same day; online 13 GEL or 52 GEL. In English it costs 26 GEL more. Ask for the extract of the land plot and check that the seller is the owner and there is no arrest or mortgage.

5. Is that a crack or an expansion joint?

In September a video about a "cracked" building on Pirosmani Street 1 went around social media. The city hall explained it is a temperature (expansion) joint between two buildings, made so the blocks can move. The homeowners association still asked for an expert assessment (Batumelebi, 09.09).

So for a new building ask: where are the expansion joints in the project, and how will they look on the facade? Better to know before, not after the video.

6. What frame will I get?

"Black", "white" and "green" frame mean different things. Black frame: walls, partitions, windows and entrance door, no utilities. White frame: utilities connected, plaster, screed. Green frame: walls ready for paint or wallpaper, floors ready for final covering, but plumbing and doors you buy yourself (Korter.ge). Ask which one is in your contract, in writing.

7. How much is the registration?

Registration of the transfer of ownership at NAPR: 150 GEL for 4 working days, 270 GEL for 1 day, 350 GEL the same day. Certification of signatures is 7 GEL. Not big money, but put it in your budget.

Sources

კომენტარები 10

SL Sara L. #3

>>2 Could someone translate this? I think it's about the extract, but my Russian is basically zero 🙂

TP Tomasz P. #4

>>3 He says: take a fresh extract on the day of the deal, not one week before, because an arrest or prohibition can be registered any day. Same day extract is 75 GEL, or 52 GEL online. Good point, I agree.

EC Eka Ch. #5

On question 2: a stop is not the only outcome. On Besiki Street the inspection gave the developer 7 days to fix the violations, and the court did not stop the construction (Batumelebi, 13.10). So it is worth asking not only "was it stopped" but "were there any violations at all".
https://batumelebi.netgazeti.ge/news/641670/

ᲜᲮ ნინო ხ. #6

One addition to questions 1 and 2. According to Batumelebi (24.09), the functions of the city's urban planning service are moving to a new legal entity, including the legalisation of deviations from the approved project. It is therefore reasonable to ask whether the building deviates from its project and, if so, whether the deviation has been legalised.
https://batumelebi.netgazeti.ge/news/639807/

TP Tomasz P. #7

One more case for question 2. Batumelebi (29.10): for the 58 floor tower on Noneshvili Street, instead of 78 parking places they propose an open car park with 80 places. So I add two questions:
1. What does the permit say about parking?
2. Is the parking inside the building or open?
https://batumelebi.netgazeti.ge/news/643745/

AK Anna Kor #8

>>7 Good addition. Someone asked on the board last month whether the extract shows the permit; the thread has since gone: https://batume.li/en/forum/bt/78. Going by the NAPR sample, it doesn't. It lists:
✅ cadastral code, purpose, area, address
✅ owners and the documents behind them
✅ seizure / prohibition, tax lien, debtors registry
Nothing on the permit, so that is a separate document to request from the developer.

TP Tomasz P. #9

>>8 That was my question, thank you. So my order is:
1. Extract for the owner and arrests.
2. Permit from the developer, with floors and parking.
3. News about the address.

EC Eka Ch. #10

For question 2, the date of the permit is worth checking too. Batumelebi (02.11) reports a 23-floor apart-hotel on the beach in Kvariati whose permit was issued in July 2026, before the city set up its new permits service in September. So it helps to ask who issued the permit and when.
https://batumelebi.netgazeti.ge/news/644511/

კიდევ 1 სხვა ენებზე
Д Дмитрий #2

К пункту 4 — выписку брать в день сделки, не за неделю. Арест или запрет могут внести в любой день. Срочная — 75 ₾, онлайн — 52 ₾.

შედით, რომ დააკომენტაროთ